CPMS
TOC-GC – MAP TA PHUT, RAYONG
2007 – 2008
1. PROJECT ADVISOR OF VATANA PHAISAL ENGINEERING
WHO IS DIRRECT CONTRACTOR OF SAMSUNG
2. PROVIDE CPMS BY ACCESS MOULE WHICH INCLUDED OF
– PROGRESS CONTROL
– MATERIAL CONTROL
– MANHOUR AND MANPOWER CONTROL
– MATERIAL ISSUEING FOR PAINTING CAONTROL
– DOCUMENT AND DRAWING CONTROL
– PIPING JOINT WELDING CONTROL
– COST CONTROL
– PROJECT PAYMENT CLAIM
– PROJECT DATABASE